The ring frame was taped to the main hull, inside and out. The floor was cut to fit and all the lockers cut out. All the foam was dug out onthe edges of the lockers and filled with bog. The centreboard case was taped in.
I painted under the floor (inside the lockers) because it is hard to paint in these areas after the floor is installed.
The temporary frame for the cabin top was built and the cabin sides attached. The sides were only temporarily attached because the cabin topwill be removed to finish inside.
Total time 356 hours
Subscribe to:
Post Comments (Atom)
Scarab 16 beams part 3
I painted the beams to match the rest of the boat using 2 pack epoxy primer and Jotun Imperite (Home Yellow). The aluminiu...
-
I have been busy with many projects lately. The Scarab 18 has been painted and Ray is finishing the boat himself. If you want to see more pi...
-
A few years ago Ray designed a small trimaran to be sold as a kit using plywood. It was 3m long and met the international 3 metre rules. It ...
-
One more beam finished (two down – two to go). I’ve been asked to provide more information and more pictures, so here we go. The mould was b...
No comments:
Post a Comment