The first float joints were filled, sanded and faired. The float was glassed the same way as the main-hull (double bias cloth over the bottom 3 panels and double bias tape on the other joints).
The float was removed from the frame and taped inside.
The other float was built on the frame in the same way and glassed outside.
Total time 151 hours