The edges of the cabin top were taped. Cockpit seat risers are taped in. Cockpit seats glassed in and transome added. Windows for the cabin and the lid for the anchor locker were cut out.
Sunday, March 29, 2009
Sunday, March 1, 2009
Scarab 18 folding trimaran Part 11
Foam was attached temporarily to the cabin sides. The top was then glassed. The edges finished and taped. Undo the straps connecting the cabin top to the hull and remove the cabin top. It is much easier to add the reinforcing at this point rather than work overhead in a confined space. The main hatch was cut out and reinforced. The cabin top was finished ready to paint before it is attached to the hull. The cabin top was attached to the hull. All the plywood surroundsfor the lockers were glued in place.
Total time 406 hours
Total time 406 hours
Subscribe to:
Posts (Atom)
Scarab 16 beams part 3
I painted the beams to match the rest of the boat using 2 pack epoxy primer and Jotun Imperite (Home Yellow). The aluminiu...
-
I have been busy with many projects lately. The Scarab 18 has been painted and Ray is finishing the boat himself. If you want to see more pi...
-
A few years ago Ray designed a small trimaran to be sold as a kit using plywood. It was 3m long and met the international 3 metre rules. It ...
-
One more beam finished (two down – two to go). I’ve been asked to provide more information and more pictures, so here we go. The mould was b...